State Route RT Y N North-FRANKLIN COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.064 MILE(S) AFTER CRD STONE CHURCH RD S.
Scheduled from03-JUN-2024to16-OCT-2024.
State Route RT Y S South-FRANKLIN COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure begins.942 MILE(S) AFTER RT YY E.
Scheduled from03-JUN-2024to16-OCT-2024.
CST HUSTER RD N North-ST. CHARLES COUNTY- Road Closed
MILLING/RESURFACING WORK
Road closure begins.096 MILE(S) AFTER CST HAYFORD RD S.
Scheduled from03-JUN-2024to10-JUN-2024.
CST HUSTER RD S South-ST. CHARLES COUNTY- Road Closed
MILLING/RESURFACING WORK
Road closure begins.061 MILE(S) AFTER CST FOUNTAIN LAKES BLVD E.
Scheduled from03-JUN-2024to10-JUN-2024.
CST IVY W West-ST. CHARLES COUNTY- Road Closed
NEW PAVEMENT CONSTRUCTION
Road closure beginsMO 94 W.
Scheduled from18-JUL-2022to01-AUG-2030.
Ramp RP LAMBERT INTL BLVD TO IS70E E East-ST. LOUIS COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsCST NATURAL BRIDGE RD E.
Scheduled from03-APR-2024to28-JUN-2024.
Ramp RP LAMBERT INTL BLVD TO IS70E E East-ST. LOUIS COUNTY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsCST NATURAL BRIDGE RD E.
Scheduled from03-APR-2024to28-JUN-2024.
Ramp RP ARSENAL AVE TO IS55N N North-ST. LOUIS CITY- Road Closed
SHOULDER WORK
Road closure beginsCST ARSENAL ST E.
Scheduled from13-MAY-2024to11-JUN-2024.
Ramp RP CHEROKEE ST TO IS55S S South-ST. LOUIS CITY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsCST CHEROKEE ST E.
Scheduled from03-MAY-2022to01-DEC-2024.
Ramp RP GERMANIA ST TO IS55N N North-ST. LOUIS CITY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsCST GERMANIA AVE E.
Scheduled from09-JAN-2023to01-DEC-2024.
Ramp RP IS55N TO IDAHO AVE N North-ST. LOUIS CITY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsIS 55 N.
Scheduled from09-JAN-2023to01-DEC-2024.
Ramp RP LOUGHBOROUGH AVE TO IS55N N North-ST. LOUIS CITY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsCST IDAHO AVE E.
Scheduled from09-JAN-2023to01-DEC-2024.
Ramp RP RIVERVIEW DR TO IS270E E East-ST. LOUIS CITY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsRT H N.
Scheduled from21-FEB-2023to22-FEB-2027.
Ramp RP S 7TH BLVD TO IS44W W West-ST. LOUIS CITY- Road Closed
MEDIAN OR SHOULDER
Road closure beginsCST S 7TH BLVD S.
Scheduled from05-JUN-2024to28-JUN-2024.
Ramp RP TRUMAN PKWY TO IS55S S South-ST. LOUIS CITY- Road Closed
BRIDGE RECONSTRUCTION
Road closure beginsCST LAFAYETTE AVE E.
Scheduled from06-DEC-2022to01-DEC-2024.
Interstate IS 44 W West-FRANKLIN COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 18-MAR-2024 to 01-NOV-2024.
Road work begins.315 MILE(S) AFTER MO 185 S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of07:00 PMand06:00 AM.
Outer Road N OR 44 E East-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins.156 MILE(S) BEFORE CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
Outer Road N OR 44 E East-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work beginsRT WW E.
Work will be done on weekdays only.
Outer Road N OR 44 W West-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work beginsRT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
Outer Road N OR 44 W West-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins.157 MILE(S) AFTER CST WILDWOOD TERRACE S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
Outer Road N OR 44 W West-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins.005 MILE(S) AFTER MO 47 S.
Work will be done on weekdays only.
Outer Road S OR 44 E East-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work beginsRT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
Outer Road S OR 44 W West-FRANKLIN COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work beginsMO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT E W West-FRANKLIN COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins.02 MILE(S) AFTER MO 100 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT H N North-FRANKLIN COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-JUN-2024 to 10-JUN-2024.
Road work begins.026 MILE(S) AFTER CRD ELMONT RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT H S South-FRANKLIN COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 06-JUN-2024 to 10-JUN-2024.
Road work begins.025 MILE(S) BEFORE CRD JAPAN STORE RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT YY E East-FRANKLIN COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work beginsRT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT YY E East-FRANKLIN COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins.04 MILE(S) BEFORE RT C S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT YY W West-FRANKLIN COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins.047 MILE(S) AFTER MO 185 S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT YY W West-FRANKLIN COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 05-JUN-2024 to 01-NOV-2024.
Road work begins.051 MILE(S) AFTER CRD SCHOENENBURG RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route MO 100 E East-FRANKLIN COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-JUN-2024 to 28-JUN-2024.
Road work begins.045 MILE(S) AFTER CST VOSSBRINK DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
State Route MO 100 E East-FRANKLIN COUNTY- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-MAY-2024 to 28-JUN-2024.
Road work begins.017 MILE(S) AFTER CST BEDFORD CENTER DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 100 W West-FRANKLIN COUNTY- Delays Possible
LIGHTING/SIGNAL/SIGN WORK
Scheduled from 21-MAY-2024 to 28-JUN-2024.
Road work begins.261 MILE(S) BEFORE CST FIFTH ST E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 185 N North-FRANKLIN COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins.018 MILE(S) BEFORE RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route MO 185 S South-FRANKLIN COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins.023 MILE(S) BEFORE RT WW E.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT WW E East-FRANKLIN COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work begins.001 MILE(S) BEFORE RT D S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT WW W West-FRANKLIN COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 25-MAR-2024 to 01-NOV-2024.
Road work beginsMO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
Interstate IS 55 N North-JEFFERSON COUNTY- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 27-FEB-2024 to 15-APR-2025.
Road work begins.208 MILE(S) BEFORE US 61 S.
Work will be done 7 days a week.
Interstate IS 55 S South-JEFFERSON COUNTY- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-MAR-2024 to 15-APR-2025.
Road work begins.415 MILE(S) BEFORE CST HERKY-HORINE RD E.
Work will be done 7 days a week.
State Route MO 21 N North-JEFFERSON COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 25-FEB-2024 to 01-NOV-2024.
Road work begins.039 MILE(S) BEFORE CRD OLD HWY 21 S.
Work will be done 7 days a week.
State Route MO 21 S South-JEFFERSON COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 28-SEP-2023 to 28-JUN-2024.
Road work begins.051 MILE(S) AFTER CRD TESSON FERRY RD S.
Work will be done 7 days a week.
Ramp RP IS55N TO US67N N North-JEFFERSON COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins.013 MILE(S) AFTER IS 55 N.
Work will be done on weekdays only.
Ramp RP IS55S TO US67S S South-JEFFERSON COUNTY- Expect Delays
INTERSECTION IMPROVEMENTS
Scheduled from 26-JAN-2024 to 31-DEC-2024.
Road work begins.005 MILE(S) AFTER IS 55 S.
Work will be done on weekdays only.
Ramp RP US67N TO IS55N N North-JEFFERSON COUNTY- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work beginsUS 67 N.
Work will be done on weekdays only.
Ramp RP US67S TO IS55S S South-JEFFERSON COUNTY- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 22-JAN-2024 to 31-DEC-2024.
Road work beginsUS 67 S.
Work will be done on weekdays only.
US US 67 N North-JEFFERSON COUNTY- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins.091 MILE(S) BEFORE RP US67N TO IS55S S.
Work will be done on weekdays only.
US US 67 S South-JEFFERSON COUNTY- Expect Delays
NEW PAVEMENT CONSTRUCTION
Scheduled from 04-JUN-2024 to 31-JUL-2024.
Road work begins.088 MILE(S) AFTER RP US67S TO IS55N N.
Work will be done 7 days a week.
US US 67 S South-JEFFERSON COUNTY- Expect Delays
MEDIAN OR SHOULDER
Scheduled from 05-FEB-2024 to 31-DEC-2024.
Road work begins.027 MILE(S) BEFORE RP US67S TO IS55N N.
Work will be done on weekdays only.
State Route RT C N North-JEFFERSON COUNTY- Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 04-JUN-2025.
Road work beginsRT Y S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT C S South-JEFFERSON COUNTY- Delays Possible
PAVEMENT REPAIR
Scheduled from 28-MAY-2024 to 04-JUN-2025.
Road work beginsRT B S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route RT FF N North-JEFFERSON COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-JUN-2024 to 14-JUN-2024.
Road work begins.109 MILE(S) AFTER PVT HIGH TRAILS DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Interstate IS 70 E East-ST. CHARLES COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 07-JUN-2024 to 10-JUN-2024.
Road work begins.201 MILE(S) BEFORE RP IS70E TO BRYAN RD S.
Work will be done 7 days a week.
Interstate IS 70 E East-ST. CHARLES COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-MAY-2024 to 24-JUL-2024.
Road work begins.078 MILE(S) BEFORE RP MID RIVERS MALL DR N TO IS70E E.
Work will be done 7 days a week.
Interstate IS 70 W West-ST. CHARLES COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 23-MAY-2024 to 24-JUL-2024.
Road work begins.072 MILE(S) AFTER MO 370 E.
Work will be done 7 days a week.
CST CAVE SPRINGS RD N North-ST. CHARLES COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins.009 MILE(S) BEFORE CST VETERANS MEMORIAL PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
CST CAVE SPRINGS RD S South-ST. CHARLES COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work beginsOR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
CST ZUMBEHL RD N North-ST. CHARLES COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins.002 MILE(S) AFTER OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
CST ZUMBEHL RD S South-ST. CHARLES COUNTY- Delays Possible
BRIDGE RECONSTRUCTION
Scheduled from 15-MAR-2023 to 28-JUN-2024.
Road work begins.002 MILE(S) BEFORE OR 70 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
Interstate IS 70 E East-ST. CHARLES COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-MAY-2024 to 24-SEP-2024.
Road work begins.141 MILE(S) BEFORE RP OR70E TO IS70E E.
Work will be done on weekdays only.
Interstate IS 70 E East-ST. CHARLES COUNTY- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins.249 MILE(S) AFTER CST EXECUTIVE CENTRE PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
Interstate IS 70 W West-ST. CHARLES COUNTY- Delays Possible
ROADSIDE WORK
Scheduled from 05-JUL-2022 to 28-JUN-2024.
Road work begins.01 MILE(S) BEFORE CST CONVENTION CENTER BLVD S.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
Interstate IS 70 W West-ST. CHARLES COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 22-MAY-2024 to 24-SEP-2024.
Road work begins.463 MILE(S) BEFORE RP IS70W TO T R HUGHES BLVD S S.
Work will be done on weekdays only.
State Route RT D E East-ST. CHARLES COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 15-APR-2024 to 14-JUN-2024.
Road work begins.02 MILE(S) AFTER PVT COUNTRY OAKS E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Interstate IS 270 E East-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 30-JUN-2024.
Road work begins.008 MILE(S) AFTER CST CLAYTON RD E.
Work will be done 7 days a week.
Interstate IS 270 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 08-APR-2024 to 30-JUN-2024.
Road work begins.026 MILE(S) AFTER RP MO340E TO IS270W W.
Work will be done 7 days a week.
Interstate IS 44 E East-ST. LOUIS COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 28-MAY-2024 to 11-JUN-2024.
Road work begins.529 MILE(S) AFTER RT OO S.
Work will be done on weekdays and Saturdays.
Interstate IS 44 W West-ST. LOUIS COUNTY- Expect Delays
MILLING/RESURFACING WORK
Scheduled from 28-MAY-2024 to 11-JUN-2024.
Road work begins.22 MILE(S) BEFORE CST FLINT DR E.
Work will be done on weekdays and Saturdays.
Interstate IS 55 N North-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins.024 MILE(S) BEFORE RP IS55N TO IS270E E.
Work will be done 7 days a week.
State Route MO 100 E East-ST. LOUIS COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work begins.04 MILE(S) BEFORE CST WEST COUNTY SHOP CTR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of03:00 AMand01:00 PM.
State Route MO 100 W West-ST. LOUIS COUNTY- Expect Delays
RESURFACING PAVEMENT
Scheduled from 03-JAN-2024 to 31-OCT-2024.
Road work beginsCST SYLVAN PL S.
Work will be done on weekdays only.
Work will be conducted between the hours of03:00 AMand01:00 PM.
State Route MO 340 E East-ST. LOUIS COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins.036 MILE(S) BEFORE OR 340 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
State Route MO 340 W West-ST. LOUIS COUNTY- Expect Delays
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 03-OCT-2022 to 15-OCT-2024.
Road work begins.018 MILE(S) AFTER IS 270 W.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand03:00 PM.
State Route MO 364 E East-ST. LOUIS COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 28-JUN-2024.
Road work begins.183 MILE(S) BEFORE RP MO364E TO MO141S S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand05:00 PM.
State Route MO 364 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 01-MAR-2024 to 28-JUN-2024.
Road work begins.135 MILE(S) AFTER CRD SEVEN PINES DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of05:00 AMand02:00 PM.
Ramp RP IS270E TO RTAB E East-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work beginsIS 270 E.
Work will be done 7 days a week.
Ramp RP IS270W TO RTAB W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work beginsIS 270 W.
Work will be done 7 days a week.
Ramp RP RTAB TO IS270E E East-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 19-APR-2024 to 31-OCT-2024.
Road work beginsRT AB E.
Work will be done 7 days a week.
Work will be conducted between the hours of08:05 AMand12:00 PM.
Ramp RP RTAB TO IS270W W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 21-MAY-2024 to 31-OCT-2024.
Road work beginsRT AB E.
Work will be done 7 days a week.
US US 67 N North-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2024 to 05-NOV-2024.
Road work begins.016 MILE(S) AFTER RP US67N TO MO180E E.
Work will be done 7 days a week.
US US 67 N North-ST. LOUIS COUNTY- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work beginsUS 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
US US 67 S South-ST. LOUIS COUNTY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-MAY-2024 to 05-NOV-2024.
Road work begins.047 MILE(S) AFTER RP US67S TO MO180E E.
Work will be done 7 days a week.
US US 67 S South-ST. LOUIS COUNTY- Expect Delays
ROADSIDE WORK
Scheduled from 06-MAR-2024 to 31-OCT-2024.
Road work begins.028 MILE(S) AFTER CST CHESTER AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
Interstate IS 270 E East-ST. LOUIS COUNTY- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins.142 MILE(S) AFTER RP LILAC AVE TO IS270E E.
Work will be done 7 days a week.
Work will be conducted between the hours of12:00 AMand12:00 PM.
CST S EATHERTON RD N North-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work beginsMO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
CST S EATHERTON RD S South-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins.132 MILE(S) BEFORE CST SKYWAY DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
CST WILD HORSE CREEK RD E East-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins.096 MILE(S) BEFORE PVT LAUREY LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
CST WILD HORSE CREEK RD W West-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work beginsMO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-JUN-2024 to 13-JUN-2024.
Road work begins.01 MILE(S) AFTER RP MURDOCH AVE TO IS44W W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
Interstate IS 70 E East-ST. LOUIS COUNTY- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins.005 MILE(S) AFTER IS 270 E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand05:00 AM.
Interstate IS 70 W West-ST. LOUIS COUNTY- Delays Possible
MILLING/RESURFACING WORK
Scheduled from 22-APR-2024 to 30-JUN-2024.
Road work begins.096 MILE(S) BEFORE CST SPRINGDALE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand05:00 AM.
State Route MO 109 N North-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins.08 MILE(S) AFTER CST WILDWOOD POINT E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 109 S South-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work beginsRT CC E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 340 E East-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 29-APR-2024 to 21-JUN-2024.
Road work begins.009 MILE(S) AFTER CST COUNTRY RIDGE DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Ramp RP MO141S TO MO364E E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE MAINTENANCE
Scheduled from 07-JUN-2024 to 28-JUN-2024.
Road work beginsMO 141 S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand05:00 PM.
State Route RT AB E East-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-JUN-2024 to 14-JUN-2024.
Road work begins.019 MILE(S) AFTER CST LADUE LAKE DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:30 PM.
State Route RT CC E East-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work beginsMO 109 S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT CC W West-ST. LOUIS COUNTY- Delays Possible
INTERSECTION IMPROVEMENTS
Scheduled from 06-MAR-2024 to 01-DEC-2025.
Road work begins.01 MILE(S) BEFORE CST WILD HORSE RANCH LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT D E East-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 04-JUN-2024 to 16-JUN-2024.
Road work begins.061 MILE(S) BEFORE CST WALTON RD S.
Work will be done on weekdays and Saturdays.
Work will be conducted between the hours of09:00 AMand07:00 AM.
State Route RT D E East-ST. LOUIS COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins.049 MILE(S) BEFORE RR TRRA WEST BELT E.
Work will be done 7 days a week.
State Route RT D W West-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-JUN-2024 to 13-JUN-2024.
Road work begins.019 MILE(S) AFTER CST R M MOORE AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:30 PM.
State Route RT D W West-ST. LOUIS COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 17-APR-2024 to 12-JUN-2024.
Road work begins.012 MILE(S) AFTER CST PURDUE AVE S.
Work will be done 7 days a week.
State Route RT N N North-ST. LOUIS COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 02-SEP-2024.
Road work begins.005 MILE(S) BEFORE CST THOROUGHMAN AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
State Route RT N S South-ST. LOUIS COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 02-SEP-2024.
Road work begins.002 MILE(S) BEFORE CST JEAN DR E.
Work will be done on weekdays only.
Work will be conducted between the hours of07:00 AMand04:00 PM.
US US 67 N North-ST. LOUIS COUNTY- Delays Possible
SIDEWALK/ADA IMPROVEMENTS
Scheduled from 06-MAY-2024 to 26-JUN-2024.
Road work beginsCST FERRAND WOODS LN E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:30 AMand03:00 PM.
US US 67 S South-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-JUN-2024 to 13-JUN-2024.
Road work begins.035 MILE(S) AFTER CST FRONTAGE AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:30 PM.
US US 67 S South-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 07-JUN-2024 to 13-JUN-2024.
Road work begins.12 MILE(S) AFTER CST OLD ST CHARLES RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:30 PM.
Interstate IS 55 N North-ST. LOUIS CITY- Expect Delays
SHOULDER WORK
Scheduled from 13-MAY-2024 to 11-JUN-2024.
Road work begins.002 MILE(S) BEFORE RP ARSENAL AVE TO IS55N N.
Work will be done 7 days a week.
Work will be conducted between the hours of08:00 AMand07:00 PM.
Interstate IS 55 S South-ST. LOUIS CITY- Expect Delays
BRIDGE RECONSTRUCTION
Scheduled from 06-DEC-2022 to 01-DEC-2024.
Road work begins.009 MILE(S) AFTER PED CARROLL ST OVERPASS S.
Work will be done 7 days a week.
Interstate IS 270 W West-ST. LOUIS CITY- No Expected Delays
MEDIAN OR SHOULDER
Scheduled from 19-JUN-2023 to 17-JUN-2024.
Road work begins.053 MILE(S) AFTER RT H S.
Work will be done 7 days a week.
Work will be conducted between the hours of12:00 AMand12:00 PM.
Interstate IS 44 E East-ST. LOUIS CITY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-JUN-2024 to 13-JUN-2024.
Road work begins.099 MILE(S) AFTER RP GRAND BLVD TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
Interstate IS 44 W West-ST. LOUIS CITY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 06-JUN-2024 to 13-JUN-2024.
Road work begins.011 MILE(S) AFTER CST NEBRASKA AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
Interstate IS 44 W West-ST. LOUIS CITY- Delays Possible
MEDIAN OR SHOULDER
Scheduled from 05-JUN-2024 to 28-JUN-2024.
Road work begins.005 MILE(S) BEFORE RP S 7TH BLVD TO IS44W W.
Work will be done 7 days a week.
Work will be conducted between the hours of09:00 AMand05:00 PM.
Interstate IS 44 W West-ST. LOUIS CITY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 30-MAY-2024 to 14-JUN-2024.
Road work begins.031 MILE(S) BEFORE CST EDWARDS ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
CST CUMBERLAND WAY N North-FRANKLIN COUNTY- CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-JUN-2024 to 20-JUN-2024.
Road work begins.021 MILE(S) AFTER CST PARK RDG E.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
CST CUMBERLAND WAY S South-FRANKLIN COUNTY- CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 11-JUN-2024 to 20-JUN-2024.
Road work beginsMO 185 S.
Work will be done 7 days a week.
Work will be conducted between the hours of07:00 AMand05:00 PM.
State Route MO 185 N North-FRANKLIN COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-JUN-2024 to 12-JUN-2024.
Road work begins.023 MILE(S) BEFORE CRD ELM SPRING RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 185 S South-FRANKLIN COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 11-JUN-2024 to 12-JUN-2024.
Road work beginsCST SYCAMORE E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT CC N North-FRANKLIN COUNTY- Expect Delays
CULVERT REPLACEMENT
Scheduled from 17-JUN-2024 to 15-NOV-2024.
Road work begins.143 MILE(S) AFTER CRD HAGG RD E.
Work will be done 7 days a week.
State Route RT CC S South-FRANKLIN COUNTY- Expect Delays
CULVERT REPLACEMENT
Scheduled from 17-JUN-2024 to 15-NOV-2024.
Road work begins.402 MILE(S) AFTER CST BROADWAY ST E.
Work will be done 7 days a week.
State Route RT T E East-FRANKLIN COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-JUN-2024 to 18-JUN-2024.
Road work begins.038 MILE(S) AFTER CRD SECOND ST S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route RT T W West-FRANKLIN COUNTY- Expect Delays
BRIDGE MAINTENANCE
Scheduled from 13-JUN-2024 to 18-JUN-2024.
Road work begins.016 MILE(S) BEFORE CRD DECKER RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Ramp RP IS55S TO US67S S South-JEFFERSON COUNTY- CLOSED
NEW PAVEMENT CONSTRUCTION
Scheduled from 14-JUN-2024 to 15-JUN-2024.
Road work beginsIS 55 S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 PMand07:00 AM.
Interstate IS 55 S South-JEFFERSON COUNTY- Expect Delays
PAVEMENT REPAIR
Scheduled from 14-JUN-2024 to 15-JUN-2024.
Road work begins.085 MILE(S) AFTER CST CENTRAL AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
CST BRYAN RD N North-ST. CHARLES COUNTY- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 17-JUN-2024 to 26-AUG-2024.
Road work begins.014 MILE(S) BEFORE IS 70 E.
Work will be done 7 days a week.
CST BRYAN RD S South-ST. CHARLES COUNTY- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 17-JUN-2024 to 26-AUG-2024.
Road work begins.013 MILE(S) BEFORE IS 70 W.
Work will be done 7 days a week.
Interstate IS 70 W West-ST. CHARLES COUNTY- Expect Delays
PAVEMENT REPAIR
Scheduled from 10-JUN-2024 to 11-JUN-2024.
Road work begins.035 MILE(S) BEFORE RP IS70W TO WENTZVILLE PKWY N.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 PMand07:00 AM.
Interstate IS 70 W West-ST. CHARLES COUNTY- Expect Delays
Project Name -Improve I-70 project #2
PERMIT OR UTILITY WORK
Scheduled from 14-JUN-2024 to 20-JUN-2024.
Road work begins.001 MILE(S) AFTER CST WENTZVILLE PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 PMand06:00 AM.Project Web Page -https://www.modot.org/improvei70/warrentonwentzville
News Releases -pending
Interstate IS 64 W West-ST. CHARLES COUNTY- Delays Possible
Project Name -Improve I-70 project #2
PERMIT OR UTILITY WORK
Scheduled from 10-JUN-2024 to 13-JUN-2024.
Road work beginsRT K S.
Work will be done on weekdays only.
Work will be conducted between the hours of05:00 AMand12:00 PM.Project Web Page -https://www.modot.org/improvei70/warrentonwentzville
News Releases -pending
Interstate IS 70 W West-ST. CHARLES COUNTY- Delays Possible
Project Name -Improve I-70 project #2
PERMIT OR UTILITY WORK
Scheduled from 14-JUN-2024 to 19-JUN-2024.
Road work begins.001 MILE(S) AFTER CST WENTZVILLE PKWY E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand02:00 PM.Project Web Page -https://www.modot.org/improvei70/warrentonwentzville
News Releases -pending
CST GREEN PARK RD E East-ST. LOUIS COUNTY- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2024 to 12-JUL-2024.
Road work begins.017 MILE(S) AFTER CST GREEN PARK INDUSTRIAL DR E.
Work will be done 7 days a week.
CST GREEN PARK RD W West-ST. LOUIS COUNTY- CLOSED
BRIDGE RECONSTRUCTION
Scheduled from 10-JUN-2024 to 12-JUL-2024.
Road work begins.001 MILE(S) AFTER CRD UNION RD S.
Work will be done 7 days a week.
CST BOWLES AVE N North-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.008 MILE(S) AFTER OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Interstate IS 270 E East-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.26 MILE(S) BEFORE CRD MARSHALL RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Interstate IS 270 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.072 MILE(S) AFTER RP IS270W TO BIG BEND RD W.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Interstate IS 270 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.009 MILE(S) BEFORE RP IS44W TO IS270W W.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Interstate IS 270 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 11-JUN-2024 to 18-JUN-2024.
Road work begins.225 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
State Route MO 100 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.001 MILE(S) AFTER RP IS270E TO MO100W W.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
State Route MO 109 S South-ST. LOUIS COUNTY- Expect Delays
CULVERT REPLACEMENT
Scheduled from 12-JUN-2024 to 13-JUN-2024.
Road work begins.139 MILE(S) BEFORE PVT EUREKA HIGH SCHOOL E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 141 N North-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.008 MILE(S) AFTER OR 44 W.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
State Route MO 141 S South-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.017 MILE(S) BEFORE RP MO141S TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
State Route MO 30 W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 20-JUN-2024.
Road work begins.005 MILE(S) AFTER CRD GRAVOIS RD W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Ramp RP IS270E TO MO100W W West-ST. LOUIS COUNTY- Expect Delays
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.065 MILE(S) AFTER RP IS270E TO WEST COUNTY SHOP CTR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
CO NOR44W TO SOR44E E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.004 MILE(S) AFTER CO FENTON LOGISTICS PK BLVD TO SOR44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
CO SOR44E TO FENTON LOGISTICS PK BLVD N North-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.048 MILE(S) BEFORE OR 44 E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 270 E East-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 17-JUN-2024 to 24-JUN-2024.
Road work begins.083 MILE(S) AFTER RP IS270E TO LILAC AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 PMand05:00 AM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 11-JUN-2024 to 25-JUN-2024.
Road work begins.099 MILE(S) AFTER US 50 E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.084 MILE(S) BEFORE CST ELM AVE S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.027 MILE(S) AFTER RP IS44E TO BIG BEND RD E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.087 MILE(S) AFTER RP SHREWSBURY AVE TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.078 MILE(S) BEFORE CST BERRY RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.076 MILE(S) BEFORE CST LACLEDE STATION RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.035 MILE(S) BEFORE RP MO141S TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 11-JUN-2024 to 25-JUN-2024.
Road work begins.091 MILE(S) AFTER RP IS44W TO US67S S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.054 MILE(S) AFTER RP IS44W TO BIG BEND RD W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.074 MILE(S) AFTER RP IS44W TO NO BERRY RD W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.057 MILE(S) AFTER RP IS44W TO ELM AVE N.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.088 MILE(S) BEFORE CST MURDOCH AVE E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.085 MILE(S) BEFORE CST LACLEDE STATION RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 10-JUN-2024 to 24-JUN-2024.
Road work begins.145 MILE(S) BEFORE RR RIVER SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-JUN-2024 to 21-JUN-2024.
Road work begins.078 MILE(S) AFTER RR RIVER SUB S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.07 MILE(S) BEFORE MO 141 N.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Interstate IS 44 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.071 MILE(S) BEFORE PVT MARITZ ENT S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 100 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.01 MILE(S) AFTER RP MO100E TO IS270W W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 100 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.044 MILE(S) BEFORE RP DES PERES RD TO MO100E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 100 W West-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 13-JUN-2024 to 14-JUN-2024.
Road work begins.023 MILE(S) AFTER CRD MASON LN S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 PMand06:00 AM.
State Route MO 141 N North-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 20-JUN-2024.
Road work begins.064 MILE(S) BEFORE RP MO141N TO BIG BEND RD W W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 141 N North-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 20-JUN-2024.
Road work begins.148 MILE(S) BEFORE RP MO141N TO MO100E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 141 S South-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 19-JUN-2024.
Road work begins.076 MILE(S) AFTER RP MO141S TO MO100E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 141 S South-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 20-JUN-2024.
Road work begins.065 MILE(S) BEFORE RP MO141S TO BIG BEND RD E E.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 30 E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 20-JUN-2024.
Road work begins.069 MILE(S) AFTER RP MO30E TO MO141N N.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
State Route MO 366 E East-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-JUN-2024 to 21-JUN-2024.
Road work begins.088 MILE(S) AFTER CST OLD SAPPINGTON RD S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:30 PM.
State Route MO 366 W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 11-JUN-2024 to 25-JUN-2024.
Road work begins.032 MILE(S) AFTER RP IS270E TO MO366E E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Ramp RP IS270W TO IS44W W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 11-JUN-2024 to 18-JUN-2024.
Road work begins.04 MILE(S) AFTER IS 270 W.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Ramp RP IS270W TO MO100W W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.01 MILE(S) AFTER RP IS270W TO MO100E E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Ramp RP IS44E TO MO366E E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 11-JUN-2024 to 26-JUN-2024.
Road work begins.036 MILE(S) AFTER RP IS270W TO IS44E E.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
Ramp RP MO100E TO MO141S S South-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 13-JUN-2024 to 20-JUN-2024.
Road work begins.005 MILE(S) AFTER RP MO100W TO MO141S S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Ramp RP MO100W TO IS270W W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 14-JUN-2024 to 21-JUN-2024.
Road work begins.011 MILE(S) AFTER RP IS270E TO MO100W W.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Ramp RP MO141N TO IS44W W West-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.006 MILE(S) AFTER RP OR44W TO MO141S S.
Work will be done on weekdays only.
Work will be conducted between the hours of08:00 AMand03:00 PM.
Ramp RP MO141S TO IS44E E East-ST. LOUIS COUNTY- Delays Possible
BRIDGE INSPECTION
Scheduled from 12-JUN-2024 to 19-JUN-2024.
Road work begins.021 MILE(S) AFTER MO 141 S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.
US US 67 N North-ST. LOUIS COUNTY- Delays Possible
PERMIT OR UTILITY WORK
Scheduled from 10-JUN-2024 to 18-JUN-2024.
Road work begins.078 MILE(S) AFTER PVT COUGAR DR S.
Work will be done on weekdays only.
Work will be conducted between the hours of09:00 AMand03:00 PM.